[2011-04-26 ] - New Project
We are retained as Project Managers for 101 Room Dharamshala Spa Resort , a 5* property, Kamakhya Hospitality Services Pvt. Ltd. (Owners). Movenpick ( a swiss chain) are the operators. more |
|
|
|
|
 |
| |
List of Services
,
- PLANNING TIME
- MONITORING TIME
- RESOURSES ARE PLANNED FOR
- MONITORING RESOURSES
- PLAN QUALITY CONTROL SYSTEM.
- ENFORCE QUALITY CONTROL
- COST CONTROL.
| PLANNING TIME |
- Make the Master Schedule to Include All Packages and All Aspects of Project
- Establish Critical Path
- Repeat the Process for Each Identified Packages (Sub Projects).
- Establish Monthly / Weekly Targets
|
| MONITORING TIME |
- Collect and Feed Data
- Update Master Schedule- Project End Date
|
| RESOURSES ARE PLANNED FOR |
- Material
- Men
- Machine
- Money
- Technology When Called for
|
| MONITORING RESOURSES |
| Material |
|
- Ensure Samples/ Proposals for the use of material Submitted as Scheduled
- Analyze price bid on the basis of prime cost, bid negotiation and preparation of adjudication report
- Ensure Orders are placed as Scheduled for Long Delivery Items and Regularly for
Items Consumed Daily
- Keep Tab on Quantity Received and Consumed
|
| Men |
|
- Check Numbers Deployed
- Machinery Mobilized as Scheduled
- Keep Tab on their Individual Performance (Productivity)
& Break Down
|
| PLAN QUALITY CONTROL SYSTEM |
- Develop Project Specific Specification of Works
- Scrutiny Correctness & Adequacy of Specification of Works
- Specify Mandatory Tests and Frequency
- Specify Facilities for Field Laboratory
- Specify Approved List of Makes of Compatible Origin
- Specify Tolerances as Applicable
|
| ENFORCE QUALITY CONTROL
• |
- Setup Field Lab with all Testing Facilities Prescribed
- Identify and Approve Out Side Agency (Laboratory)
- Conduct Tests of Material as Per the Frequency of Tests in the Specification
- Conduct all Site Inspection (Pre & Post) with the aid of Check Lists – Approve/Reject.
- Record all Inspection Report on Quality and Preserve
|
| COST CONTROL |
- At Tender Stage Analyze Cost for Each Item and Determine Prime Cost to Act as Base
Line for Tender Negotiation.
- Work Out Quantities Correctly from Tender Drawings
- Work Out Bench Marking for Cost of a Module (A Particular Stage of Work)
- On Receiving GFC Drawings Work Out Quantities, Compare to that of Tender Drawings Act as the Revise Cost or Act Appropriately (Take Action to Reduce the Cost) as the Situation Demands
- At the Execution Stage Compile Data on Reaching the Predefined Stage
- Project Final Projected Cost
|
|
|
|
|